Solar Project:
Woodside Drive


BENEFITS FOR THE SPENCER COMMUNITY

✅ Tax revenue of +$24,000 annually for the community, for the 20-year duration of the project

✅ Energy generated to power nearly 300 homes

✅ Ensures local electrical grid reliability and resilience

✅ Local generation helps to keep electricity prices affordable by avoiding transmission losses and natural gas price volatility

Safety is Priority #1

Safety is at the core of every New Leaf Energy project. All BESS facilities must meet strict state and national safety codes before receiving approval to operate. 

Each system is remotely monitored, has built-in fire protection features, has a site-specific Emergency Response Plan (ERP), and is regularly inspected and maintained.

About the Project

The project is located on the back acreage off of Woodside Drive, behind a stone crushing operation, on wooded land with some previous logging activity. It will consist of a 8-acre solar array surrounded by a woven wire agricultural-style fence, and accessed via a new gravel driveway off of Woodside Drive. Electrical equipment and battery enclosures will be located within the facility. The facility will be connected to the electrical distribution grid on Woodside Drive—providing enough renewable energy to power up to 300 homes. National Grid is in the process of upgrading the Meadow Street substation, which will allow more renewable energy to interconnect and thus contribute to the state’s energy goals.

New Leaf Energy analyzes the environmental and public impacts of every project we develop. The greenhouse gas emissions avoided because of the project is equivalent to the amount sequestered by over 2,100 acres of mature forest annually, and the array footprint will be hidden from view due to its location in the back of the parcel.

THE PROJECT

Project Timeline

🗓️ First Planning Board meeting: December 15, 2026

🗓️ First Conservation Commission meeting: January 13, 2027

🗓️ Estimated Interconnection Agreement date: April 2027

🗓️ Estimated construction commencement date: Spring 2028

🗓️ Estimated construction completion date: Spring 2029

🗓️ Estimated commercial operation date: Fall 2029

ABOUT SOLAR & BATTERY ENERGY STORAGE SYSTEMS

Powering a reliable, resilient grid

Solar and battery energy storage systems are an essential part of building a modern, resilient, and low-carbon electric grid. When solar projects are paired with energy storage, solar energy becomes more reliable and flexible by delivering energy when people need it most.  

Pairing a solar project with battery energy storage allows excess daytime solar power to be stored and used when the sun isn’t shining, increasing overall efficiency and reliability. Batteries help smooth fluctuations in solar output and can provide valuable grid services like peak load reduction. This lowers electricity costs and enhances resilience during outages. It also reduces carbon emissions by replacing fossil fuel generation during peak demand. Overall, solar-plus-storage creates a more flexible, reliable, and sustainable energy system.

The Woodside Drive Solar & Storage System is located in a Capital Investment Plan (CIP) region within the MA electrical grid, where planned electrical infrastructure upgrades help enable interconnection of distributed renewable energy resources, like this project.

Download our presentation: Solar Paired with Energy Storage Systems